On the St. Lucie River, the Bridge Sets Your Boating Schedule Before the House Does

October 29, 2026

"Anyone who's spent time on the St. Lucie River knows that century-old bridge is too low, sitting at 6 feet, too narrow, and stuck in the closed position more often than it should be," Congressman Brian Mast said in Brightline's August 18, 2026 announcement of new federal money to replace it.

The Florida East Coast Railway bridge at Okeechobee Waterway mile 7.41 is a factor in boating on the St. Lucie River. The fix everyone is waiting for has partial funding and no schedule.

A Bridge That Sits Down More Than It Stands Up

The Coast Guard describes the FEC Railroad Bridge at Stuart as a single-leaf bascule with six feet of vertical clearance at mean high water when it is closed. Brightline's own project announcement puts the current clearance at 6.5 feet.

Trains keep it down a lot. In February 2026, WFLX reported that the bridge carries more than 30 trains a day, shared between Brightline passenger service and FEC freight. The track across the river is single, and the Coast Guard explained in its final rule that the bridge has to stay down whenever a train is inside the track circuit approaching it. A boater can be waiting at a closed span with no train in sight.

The federal rule that took effect November 17, 2025, now written into 33 CFR 117.317, replaced the old "open except when trains are crossing" standard with a defined schedule:

Period What the rule sets
6 a.m. to 8 p.m. Closed no more than 50 consecutive minutes in any hour, and no more than 7 total hours across the period
Top of each daytime hour Fixed 10-minute opening, which can slip up to 5 minutes if a train is in the track circuit
8:01 p.m. to 5:59 a.m. Stays open except for trains, inspections, and authorized repairs, with no closure longer than 60 consecutive minutes
Tending Bridge tender on duty 6 a.m. to 8 p.m., monitoring VHF-FM channels 9 and 16
Information 24-hour phone line at (305) 889-5576, plus an owner-run mobile app with opening times

Seven hours is half of the 14-hour daytime window. Those figures are ceilings on closures, so the span may be down for much of an hour or for very little of it, depending on train traffic. The only opening the rule fixes in advance is the 10 minutes at the top of each daytime hour. In its comments record, the Coast Guard said bridge logs and the mobile app generally line up, though it also acknowledged "minor discrepancies" tied to complex rail operations.

Bridge Clearances Along the River

The rail bridge has close company. Right beside it, at mile 7.5, the SR 707 Dixie Highway Bridge is a double-leaf bascule with 14 feet of closed clearance at mean high water, according to a February 2024 Coast Guard rule. The fixed U.S. 1 Roosevelt Bridge, at 65 feet, stands next to them, according to NOAA's Coast Pilot dated October 18, 2026. Farther up, the fixed highway bridge at Palm City, at mile 9.5, clears 54 feet, with an overhead power cable just north of it at 55 feet.

The SR 707 bridge opens on signal, but under the federal rule it "need not open" while the railroad bridge is down. It must open as soon as the rail span lifts, to clear the boats that have stacked up. Air draft is the height from the waterline to the highest fixed point on the boat.

The South Fork begins at mile 7.7 just past the downtown bridges.

What the Replacement Changes, and What It Leaves in Place

The August grant is the reason this question is live right now. USDOT awarded the City of Stuart $78.9 million toward a new double-track bridge. According to Brightline, the new span would raise closed clearance at mean high water to about 17.75 feet and widen the horizontal opening from 50 feet to about 90 feet. The company says that would let "more than 90 percent of vessels" pass while the bridge is down.

The proposed rail bridge's closed clearance of about 17.75 feet would be higher than the 14-foot clearance of the SR 707 bridge beside it.

The money is the open question. The project is estimated at $262 million. WFLX reported that combining the new award with the $130 million federal grant from 2023 brings committed federal funding to about $209 million. The station added that the City of Stuart had not announced construction timelines. That leaves about $53 million of the estimate unaccounted for in the public figures. Earlier in the year, WFLX quoted city officials at a January 26 commission meeting saying "the project couldn't move forward until all the financing was in place."

The old bridge also carries a risk. Dan Romence, president of the Marine Industries Association of the Treasure Coast, told WFLX in that same February report that "if the bridge isn't safe then they have to shut the bridge, which would completely seal off marine access for everybody."

The trains will keep crossing without a stop in town for now. WFLX reported on August 20 that Martin County did not receive federal money for a downtown Brightline station in the same grant round that funded the bridge. Mast told the station that another "$40, $50, $60, $70 million for a station" was not likely.

The Wider Martin County Market

The countywide numbers show the wider market. In September 2026, Martin County's single-family median sale price was $600,000, up 5.26% from $570,000 a year earlier, according to MIAMI REALTORS®' October 16 report. At the end of September there were 682 single-family listings across the whole county, part of 1,145 active listings, which was down 20.9% from a year earlier. Single-family homes were at 3.6 months of supply, below the 6 to 9 months the report describes as balanced. These are county figures, not Stuart-only figures, and they include every kind of home, waterfront or not.

With that few listings in a county, waterfront buyers often see only a handful of homes that fit, and they tend to compare them on the house.

Frequently Asked Questions

When will the new St. Lucie River railroad bridge be built? No construction start or completion date had been announced as of the August 2026 grant coverage. About $209 million of the estimated $262 million cost is committed in federal funding.

Does the bridge stay closed overnight? No. From 8:01 p.m. to 5:59 a.m., the rule keeps it open except for trains, inspections, and authorized repairs, with no closure longer than 60 consecutive minutes. The tender is on duty only from 6 a.m. to 8 p.m.

Will Brightline stop in downtown Stuart? Not on any funded timeline right now. The station did not receive federal money in the August 2026 round.

This post is general information about published federal bridge rules and public project reports. It is not legal, financial, or marine advice. Confirm current bridge operations with the bridge tender or the Coast Guard, and confirm the details for your boat and property with the appropriate professionals.